11
mo with infor litographs if you consider the
on this point by
matter sufficicitly passing.)
of The Consulting Architects have
not quite enough infer to
enable then to woch out the
internal architectural details &
they have therefre anti by reproact
perished with
of which a
A
Memorand
copy is enclosed,
in which
setting out the information
- should be sent them for this
in my spin on
purpose. It is very deniable
that all these details, upon
which the
success of the building
largely depends, should be prepared
by them, They have stated in
convetration that this would like
abond two moulter to complete, but
163
instalments could, if desired, be
sent out to the Colony from time
to time as
they were completed.
INUTE.
Antrobus,
Cox,
Fucos,
Graham.
E. Wingfield.
of Selborne.
Chamberlain,
but In the above proport Ido nut
i
have been received
except as regards
refer to constructional details
which it is desired should
be
worked out I the local
staff.
5 After receiving these details
and wether it is decided to begin the work
from the Architects you will
be in
[
position to
iù dent
upon the C.Agents for such
portions of the work, expecially the
savitary & heating apparatus,
are best obtained in this
11
mo with infor litographs if you consider the
on this point by
matter sufficicitly passing.)
of The Consulting Architects have
not quite enough infer to
enable then to woch out the
internal architectural details &
they have therefre anti by reproact
perished with
of which a
A
Memorand
copy is enclosed,
in which
setting out the information
- should be sent them for this
in my spin on
purpose. It is very deniable
that all these details, upon
which the
success of the building
largely depends, should be prepared
by them, They have stated in
convetration that this would like
abond two moulter to complete, but
163
instalments could, if desired, be
sent out to the Coldy from time
مانتا کل
they were completed.
INUTE.
Antrobus,
Cox,
Fucos,
Graham.
E. Wingfield.
of Selborne.
Chamberlain,
but In the above proport Ido nut
i
have been received
except as regards
refer to constructional details
which it is desired should
be
worked out I the local
staff.
5 After receiving these details
and wether it is decided to begin the work
from the Architects you will
be in
[
position to
iù dent
upon the C.Agents for such
portions of the work, expecially the
savitary & heating apparatus,
are best obtained in this
No comments yet.