CO129-295 - Public Offices - 1899 — Page 165

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

11

mo with infor litographs if you consider the

on this point by

matter sufficicitly passing.)

of The Consulting Architects have

not quite enough infer to

enable then to woch out the

internal architectural details &

they have therefre anti by reproact

perished with

of which a

A

Memorand

copy is enclosed,

in which

setting out the information

- should be sent them for this

in my spin on

purpose. It is very deniable

that all these details, upon

which the

success of the building

largely depends, should be prepared

by them, They have stated in

convetration that this would like


abond two moulter to complete, but

163

instalments could, if desired, be

sent out to the Colony from time

to time as

they were completed.

INUTE.

Antrobus,

Cox,

Fucos,

Graham.

E. Wingfield.

of Selborne.

Chamberlain,

but In the above proport Ido nut

i

have been received

except as regards

refer to constructional details

which it is desired should

be

worked out I the local

staff.

5 After receiving these details

and wether it is decided to begin the work

from the Architects you will

be in

[

position to

iù dent

upon the C.Agents for such

portions of the work, expecially the

savitary & heating apparatus,

are best obtained in this

Edit History

2026-05-31 11:51:46 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
11 mo with infor litographs if you consider the on this point by matter sufficicitly passing.) of The Consulting Architects have not quite enough infer to enable then to woch out the internal architectural details & they have therefre anti by reproact perished with of which a A Memorand copy is enclosed, in which setting out the information - should be sent them for this in my spin on purpose. It is very deniable that all these details, upon which the success of the building largely depends, should be prepared by them, They have stated in convetration that this would like abond two moulter to complete, but 163 instalments could, if desired, be sent out to the Colony from time to time as they were completed. INUTE. Antrobus, Cox, Fucos, Graham. E. Wingfield. of Selborne. Chamberlain, but In the above proport Ido nut i have been received except as regards refer to constructional details which it is desired should be worked out I the local staff. 5 After receiving these details and wether it is decided to begin the work from the Architects you will be in [ position to dent upon the C.Agents for such portions of the work, expecially the savitary & heating apparatus, are best obtained in this
Baseline (Original)
11 mo with infor litographs if you consider the on this point by matter sufficicitly passing.) of The Consulting Architects have not quite enough infer to enable then to woch out the internal architectural details & they have therefre anti by reproact perished with of which a A Memorand copy is enclosed, in which setting out the information - should be sent them for this in my spin on purpose. It is very deniable that all these details, upon which the success of the building largely depends, should be prepared by them, They have stated in convetration that this would like abond two moulter to complete, but 163 instalments could, if desired, be sent out to the Coldy from time مانتا کل they were completed. INUTE. Antrobus, Cox, Fucos, Graham. E. Wingfield. of Selborne. Chamberlain, but In the above proport Ido nut i have been received except as regards refer to constructional details which it is desired should be worked out I the local staff. 5 After receiving these details and wether it is decided to begin the work from the Architects you will be in [ position to dent upon the C.Agents for such portions of the work, expecially the savitary & heating apparatus, are best obtained in this
2026-05-31 11:51:46 · Baseline
View content

11

mo with infor litographs if you consider the

on this point by

matter sufficicitly passing.)

of The Consulting Architects have

not quite enough infer to

enable then to woch out the

internal architectural details &

they have therefre anti by reproact

perished with

of which a

A

Memorand

copy is enclosed,

in which

setting out the information

- should be sent them for this

in my spin on

purpose. It is very deniable

that all these details, upon

which the

success of the building

largely depends, should be prepared

by them, They have stated in

convetration that this would like

abond two moulter to complete, but

163

instalments could, if desired, be

sent out to the Coldy from time

مانتا کل

they were completed.

INUTE.

Antrobus,

Cox,

Fucos,

Graham.

E. Wingfield.

of Selborne.

Chamberlain,

but In the above proport Ido nut

i

have been received

except as regards

refer to constructional details

which it is desired should

be

worked out I the local

staff.

5 After receiving these details

and wether it is decided to begin the work

from the Architects you will

be in

[

position to

iù dent

upon the C.Agents for such

portions of the work, expecially the

savitary & heating apparatus,

are best obtained in this

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.